2005-2025: 20 years of Terna Dec 22, 2025 - VIDEO 6,800 people, 75,200 km of high and very high voltage lines and 915 substations managed throughout the Country, 2 million renewable plants connected, 2.4 billion euro in innovation and digitalisation. All the key figures of Terna: 20 years of service to Italy.
Povezane vesti
Apr 8, 2026 The Grid Doesn`t Need More Power Plants (It Needs This) Apr 8, 2026 ERCOT Distribution Awareness Platform Apr 2, 2026 China`s retired EV batteries now light villages, store solar power and charge new cars 30 Mar 2026 The Energy Future of Switzerland Explained 28 Mar 2026 Switzerland Built An Underground Power Plant By Hollowing Out An Entire Mountain Mar 27, 2026 Georgia Tech Lead BESS - Energy Availability at Any Time Mar 25, 2026 Everything about HVDC - Explained by an Engineer - Introduction Mar 23, 2026 Electrical grid at increasing risk of blackouts due to surging demand Mar 19, 2026 The Future of Utilities: Rising Demand, AI Impact, and Lessons from the Iberian Blackout Mar 17, 2026 Powering through the storm