|  | ||||
|        
        Sajt EE postoji od 2006. godine, sa namerom da se sve informacije iz elektroenergetike, nadju na jednom mestu. 
         POSLOVI - više poslova | ||||
| O&M SCADA and Control Manager, Maintenance and Protection O&M Manager, O&M Substations Manager 19.6.2013 - Energy Solutions d.o.o. BAJ O&M SERVICES & ENERGY AG and ENERGY SOLUTIONS DOO are looking for: O&M SCADA and Control Manager We are looking for highly motivated individuals to participate in the project for Commissioning and Taking over of Substations and provision of Operation and Maintenance services. Project summary The Project consists of a greenfield power plant comprising 3 open cycle gas turbines type LM 6000PD with SPRINT and Chillers, supplied by GE under a separate EPC Contract executed by Group Five of South Africa with a total generating capacity of 140 MW located at Osisioma, 4 km north west of the center of the city of Aba in Abia State, Federal Republic of Nigeria. A number of major airlines (Lufthansa, Air France, Emirates, British Airways, Turkish Airlines) are operating daily lines to and fro Nigeria, with connections to Lagos and Abuja. The nearest airports to Aba are in Oweri and P. Harcourt with daily connections with other main cities. Main objective of the Commissioning phase is to and establish adequate O&M procedures and train local staff so that they are able to take over the running of the system after expiration of O&M contract. Process should also include preventive maintenance in order to reduce probability of breaks in power supply. Short description of Substations system Substations are in the final stage of completion and are part of the Private Power Plant Aba (APP) project, owned by Geometric Power Aba Limited (GPAL). The system consists of: Main substation with APP 33kV GIS double busbar switchgear with four incomers from GTU transformers 60MVA and 11 feeders within Power Plant fence Four new substations 33/11kV, 2x15MVA Three leased and fully refurbished PHCN (Power Holding Company of Nigeria) substations: Umuode, Aba Control and Power Station O&M Substation operative center will be in APP substation with maintenance workshop, spare part and tools store and parking for vehicles. Considering that Leased PHCN substations require a two phase refurbishment, estimated Pre-Operational Period is six to nine months. Required Education & Experience B. Sc. degree in Electrical Engineering Working Experience: Minimum of ten years of relevant experience with focus on commissioning and O&M of substations A proven background in operations and maintenance of substations backed by the documented reference list Fluency in English Computer skills: PC Operating systems, MS office Key responsibilities In charge of permanent control of central control and data acquisition Control of SCADA for complete Substation system Urgent repair of faulty equipment and installation of the new ones including checking of functionality fault reporting and purchasing requisition if required Control of storage facility and minimal spare parts and equipment required stock level Project tasks: Implementation of the modern program for O&M procedures according to real needs: Data collection and storage Maintenance procedures for each type of equipment: material, tools, vehicles, planned time for intervention and other procedures requested by Client. Regular maintenance plans for each type of Operation and operational procedures Equipment and parts inventory Purchasing plan for spare parts and consumables Purchasing procedures Reporting procedures Data bases creation The following details will be discussed in negotiation phase: Equipment for testing and maintenance List of tool for maintenance: crew level and individual level Deadline for applications: 19.06.2013. vise informacija BAJ O&M SERVICES & ENERGY AG and ENERGY SOLUTIONS DOO are looking for: O&M Substations Manager We are looking for highly motivated individuals to participate in the project for Commissioning and Taking over of Substations and provision of Operation and Maintenance services. Project summary The Project consists of a greenfield power plant comprising 3 open cycle gas turbines type LM 6000PD with SPRINT and Chillers, supplied by GE under a separate EPC Contract executed by Group Five of South Africa with a total generating capacity of 140 MW located at Osisioma, 4 km north west of the center of the city of Aba in Abia State, Federal Republic of Nigeria. A number of major airlines (Lufthansa, Air France, Emirates, British Airways, Turkish Airlines) are operating daily lines to and fro Nigeria, with connections to Lagos and Abuja. The nearest airports to Aba are in Oweri and P. Harcourt with daily connections with other main cities. Main objective of the Commissioning phase is to and establish adequate O&M procedures and train local staff so that they are able to take over the running of the system after expiration of O&M contract. Process should also include preventive maintenance in order to reduce probability of breaks in power supply. Short description of Substations system Substations are in the final stage of completion and are part of the Private Power Plant Aba (APP) project, owned by Geometric Power Aba Limited (GPAL). The system consists of: Main substation with APP 33kV GIS double busbar switchgear with four incomers from GTU transformers 60MVA and 11 feeders within Power Plant fence Four new substations 33/11kV, 2x15MVA Three leased and fully refurbished PHCN (Power Holding Company of Nigeria) substations: Umuode, Aba Control and Power Station O&M Substation operative center will be in APP substation with maintenance workshop, spare part and tools store and parking for vehicles. Considering that Leased PHCN substations require a two phase refurbishment, estimated Pre-Operational Period is six to nine months. Required Education & Experience B. Sc. degree in Electrical Engineering Working Experience: Minimum of ten years of relevant experience with focus on commissioning and O&M of substations A proven background in operations and maintenance of substations backed by the documented reference list Fluency in English Computer skills: PC Operating systems, MS office Key responsibilities In charge for execution of all planned and urgent actions Quality management HSE management and Environmental Policy Action plan with time schedule for each regular intervention Supervision of operators in all Substations Fault reporting and documentation Establishment of Safe Procedures, permit to work and outage documentation Graphing Reporting Project tasks: Implementation of the modern program for O&M procedures according to real needs: Data collection and storage Maintenance procedures for each type of equipment: material, tools, vehicles, planned time for intervention and other procedures requested by Client. Regular maintenance plans for each type of Operation and operational procedures Equipment and parts inventory Purchasing plan for spare parts and consumables Purchasing procedures Reporting procedures Data bases creation The following details will be discussed in negotiation phase: Equipment for testing and maintenance List of tool for maintenance: crew level and individual level Deadline for applications: 19.06.2013. vise informacija BAJ O&M SERVICES & ENERGY AG and ENERGY SOLUTIONS DOO are looking for: Maintenance and Protection O&M Manager We are looking for highly motivated individuals to participate in the project for Commissioning and Taking over of Substations and provision of Operation and Maintenance services. Project summary The Project consists of a greenfield power plant comprising 3 open cycle gas turbines type LM 6000PD with SPRINT and Chillers, supplied by GE under a separate EPC Contract executed by Group Five of South Africa with a total generating capacity of 140 MW located at Osisioma, 4 km north west of the center of the city of Aba in Abia State, Federal Republic of Nigeria. A number of major airlines (Lufthansa, Air France, Emirates, British Airways, Turkish Airlines) are operating daily lines to and fro Nigeria, with connections to Lagos and Abuja. The nearest airports to Aba are in Oweri and P. Harcourt with daily connections with other main cities. Main objective of the Commissioning phase is to and establish adequate O&M procedures and train local staff so that they are able to take over the running of the system after expiration of O&M contract. Process should also include preventive maintenance in order to reduce probability of breaks in power supply. Short description of Substations system Substations are in the final stage of completion and are part of the Private Power Plant Aba (APP) project, owned by Geometric Power Aba Limited (GPAL). The system consists of: Main substation with APP 33kV GIS double busbar switchgear with four incomers from GTU transformers 60MVA and 11 feeders within Power Plant fence Four new substations 33/11kV, 2x15MVA Three leased and fully refurbished PHCN (Power Holding Company of Nigeria) substations: Umuode, Aba Control and Power Station O&M Substation operative center will be in APP substation with maintenance workshop, spare part and tools store and parking for vehicles. Considering that Leased PHCN substations require a two phase refurbishment, estimated Pre-Operational Period is six to nine months. Required Education & Experience B. Sc. degree in Electrical Engineering Working Experience: Minimum of ten years of relevant experience with focus on commissioning and O&M of substations A proven background in operations and maintenance of substations backed by the documented reference list Fluency in English Computer skills: PC Operating systems, MS office Key responsibilities In charge of all regular and urgent equipment interventions Daily training and staff development with the aims of reaching desired proficiency level and minimizing outage time Control of storage facility and minimal spare parts and equipment required stock level Project tasks: Implementation of the modern program for O&M procedures according to real needs: Data collection and storage Maintenance procedures for each type of equipment: material, tools, vehicles, planned time for intervention and other procedures requested by Client. Regular maintenance plans for each type of Operation and operational procedures Equipment and parts inventory Purchasing plan for spare parts and consumables Purchasing procedures Reporting procedures Data bases creation The following details will be discussed in negotiation phase: Equipment for testing and maintenance List of tool for maintenance: crew level and individual level Deadline for applications: 19.06.2013. vise informacija Povezani POSLOVI 12.11.2025 Field Service Engineer ABB Beograd 12.11.2025 Electrical Engineer Ehvert Mission Srbija 12.11.2025 Elektro inženjer – izrada elektro planova mašina IMS Pipe Vision Niš 11.11.2025 Diplomirani inženjer elektrotehnike Energy Saving Group Beograd 27.11.2025 Responsible Electrical Designer Power Construction Beograd 27.11.2025 Inženjer energetike KBV Datacom Beograd 08.11.2025 Inženjer za operativno upravljanje - dispečer NDC, Inženjer za sistemske usluge, Inženjer za proveru usaglašenosti i kvalitet električne energije Elektromreža Srbije Beograd 23.11.2025 Diplomiran/Master inženjer elektrotehnike (2) Elem&Elgo Beograd 23.11.2025 Electrotechnical Engineer Powerchina Surčin 08.11.2025 Vodeći inženjer - odgovorni izvođač radova LOGO Beograd 04.11.2025 Inženjer u elektro održavanju TITAN Cementara Kosjerić 06.11.2025 Elektroinženjer - projektant AGI Novi Sad 31.10.2025 Field Service Engineer ABB Beograd 05.11.2025 Inženjer energetike za izgradnju i održavanje Data centara CETIN Beograd 04.11.2025 Inženjer elektrotehnike - projektant ICCE Beograd 04.11.2025 Elektroinženjer – projektant instalacija jake i slabe struje Elkoms Consulting Building BG 04.11.2025 Electrical Designer Promus Design Group Srbija 04.11.2025 Inženjer elektro održavanja Tarkett Bačka Palanka 31.10.2025 Inženjer za bilateralno tržište električne energije, Inženjer za unutrašnje balansno tržište električne energije, Stručnjak za poslove kontrole primene preventivnih mera na poslovima održavanja elemenata prenosnog sistema Elektromreža Srbije Beograd 31.10.2025 Inženjer za alokaciju prekograničnih kapaciteta i spajanje tržišta električne energije, Inženjer za administraciju balansne odgovornosti i transparentnost tržišnih podataka Elektromreža Srbije Beograd | ||||
|   | ||||